Change your password?

Forget your username?

Next
  1. CORRIGENDUM: PD Ground Water E-bidding.
  2. Office of The PD Ground Water Invites E-bidding from
  3. CORRIGENDUM:Swat Irrigation Division Swat
  4. Executive Engineer, Swat Irrigation Division Swat invites Electronic Bids from the eligible Firms / Bidders
  5. Swabi Irrigation Division II. Invites E-Bidding from Eligible Firms/bidders
  6. Swat Irrigation Division:Cancellation of Tender (Nit no 1841)
  7. Small Dams Division Mardan Invites E-bidding
  8. Project Director Ground Water (Merged Area) invites E-Bidding for ADP 2415
  9. Technical Evaluation Report Swat Irrigation division ADP no 1341 (180617) Malkidam.
  10. Technical Evaluation Report Swat Irrigation division Matta ADP no 1341 (180617)
  11. PROJECT DIRECTORATE REMODELING OF WARSAK CANAL SYSTEM IN DISTRICT PESHAWAR & NOWSHERA IRRIGATION DEPARTMENT Notice For Pre-Qualification of Contractors
  12. MARDAN IRRIGATION DIVISION, MARDAN NOTICE INVITING E-BIDDING Irrigation Department Govt: of Khyber Pakhtunkhwa invites sealed bids for the following work
  13. Mardan Irrigation Division Mardan Addendum
  14. ADDENDUM: Mardan Irrigation Division. The following Addendum is notified for the information of all interested firms/manufactures
  15. Notice for the NIT Cancellation. Executive Engineer Irrigation and Hydel power division Tribal district North Waziristan.
  16. ADDENDUM/CORRIGENDUM: Irrigation Division Paharpur the following amendment
  17. Notification NO: Section officer Establishment notification SO(E)/ IRR/4-9/77/Vol-III
  18. Notification NO: Section officer Establishment notification SO(E)/ IRRI:/1-26/92/PF:
  19. Executive Engineer Irrigation Kohat Intends to invite Electronic Bids
  20. Executive Engineer Irrigation & Hydel Power District Khyber Announced the QUALIFIED & LOWEST BIDDER / CONTRACTOR Package-III for Bara river cannal
  21. Executive Engineer Irrigation & Hydel Power District Khyber Announced the QUALIFIED & LOWEST BIDDER / CONTRACTOR Package-II for Bara river cannal
  22. Executive Engineer Irrigation & Hydel Power District Khyber Announced the QUALIFIED & LOWEST BIDDER / CONTRACTOR Package-I for Bara river cannal
  23. Notification: Section officer Establishment notification no SO (E)/IRRI:/5-2/70:
  24. Cancellation of Tender:Office of deputy director (P & c) Small dams division KOHAT.
  25. CORRIGENDUM:Office of deputy director (P & c) Small dams division KOHAT. Technical bid opening is reschedule
  26. CORRIGENDUM:Office of deputy director (P & c) Small dams division KOHAT
  27. Executive Engineer Gomal Zam Dam Irrigation Division DIKhan invites E-bidding for Repair of buildings
  28. Executive Engineer Gomal Zam Dam Irrigation Division DIKhan invites E-bidding for the Supply of pumping machinery
  29. Deputy Director (P&C) Small Dam division Kohat intend to invites E-Bidding NIT FOR PEZU DAM, MAKH BANDA & KHATTAK BANDAN DAMS
  30. Office of the Deputy Director (P&C)Small Dams Division KOHAT Announced cancellation of tenders
  31. CORRIGENDUM: EXECUTIVE ENGINEER Irrigation & Hydle Power Division District Khyber
  32. EXECUTIVE ENGINEER Irrigation & Hydle Power Division District Khyber Float Tender. AIP No: 2019-20-WM037 Package III
  33. EXECUTIVE ENGINEER Irrigation & Hydle Power Division District Khyber Float Tender. AIP No: 2019-20-WM037 Package II
  34. EXECUTIVE ENGINEER Irrigation & Hydle Power Division District Khyber Float Tender. AIP No: 2019-20-WM037 Package I
  35. CORRIGENDUM: From EXECUTIVE ENGINEER Irrigation & Hydle Power Division District Khyber. Tender date change.
  36. Deputy Director (P&C)Small dam Division Kohat float tender in Respect of Pezu Dam.Instruction For bidder are attache with.
  37. Deputy Director (P&C)Small dam Division Kohat float tender in Respect of Pezu Dam.BOQ for Pezu Dam is attache with.
  38. Deputy Director (P&C)Small dam Division Kohat float tender in Respect of Pezu Dam.Drawing for Pezu Dam is attache with.
  39. Notice Inviting E-Bidding. Tube wells Irr:Division Peshawar invites electronic bids
  40. Notice E-bidding: Construction of Pezu Dam Project District Lakki Marwat.
  41. Notice E-bidding: AIP 201920-WM.036 Construction/Rehabilitation of other feasible Dam Schemes.
  42. Notice: E-bidding Accelerated implementation program of merge areas of tribal decade strategy.
  43. CORRIGENDUM: The notice inviting tender for development work publish in daily Mashriq.
  44. E:Bidding.ADP No. 1317/170620, REMOVAL OF DEFICIENCIES IN GOMAL ZAM DAM PROJECT.
  45. Cancellation Notice:Dandy Small Dam.
  46. Notification:Establishment of Directorate for the Jabba Dam Project.
  47. ADDENDUM/CORRIGENDUM Office of the Executive Engineer Peshawar Canals Division
  48. ESTA CODE ESTABLISHMENT CODE KHYBER PAKHTUNKHWA
  49. Director General Small Dams Irrigation Department floats NIT for Construction of Sanam Dam floated in national dailies vide advertisement No.INF(P)1986/19

QUAID-E-AZAM MUHAMMAD ALI JINNAH'S WILL

"Pakistan is a land of great potential resources. But to build it up into a country worthy of the Muslim nation, we shall require every ounce of energy that we possess and I am confident that it will come from all whole-heartedly" (August 15, 1947).



Secretary's Message

Irrigation Department, Khyber Pakhtunkhwa is a government organization with a mandate to plan, develop, manage, operate and maintain different modes of environmentally and socially acceptable Irrigation and Drainage Systems in the province. The province of Khyber Pakhtunkhwa is endowed with hydraulic civilization, natured by rich irrigation heritage. The Irrigation Department is committed to provide ensured and adequate water for irrigated agriculture for which it resorts to both development of new irrigation (flow/lift) schemes and conservation of flood water through small dams to meet province's requirements for food & fiber. Its ultimate aim is to provide year round irrigation water/facilities and increase the irrigable area of the province through implementation of new scheme and improvement in the existing infrastructure for optimal utilization of our available water resources. In the prevailing scenario, when we are confronted with, uncertain precipitation, Global Warming, Environmental Degradation, population eruption, rapid urbanization of our irrigated lands, depletion in land fertility due to twin menace of salinity and water logging, concerted national efforts are needed by all the stake holders to put the province on the course of sustainable development, prosperity and self reliance. I am confident that the Irrigation Department will tackle all the challenges confronted with it, in a scientific way for judicial, prudent and optimal utilization of our available resources.